For the Week ending 05/05/06
Directions: Choose the word that matches with the definition and appropriately fits into the blank space in the sentence.
A well capable of production but lacking wellhead installations and a pipeline connection.
As a precaution prior to the impending hurricane - most active wells were turned into _______. |
Valves, pipes, and fittings assembled at the top of a completed well used to control the flow of oil and gas.
It took six days after the hurricane in the gulf, before the _______ were operable again. |
Load-bearing tower like framework over an oil/gas well which holds the hoisting and lowering equipment.
Because of the massive size of their structure, the _______ are easy to recognize at the oil fields. |
Crew member responsible for the care and operation of the rig motors.
John "_______" as he was called, was responsible for the operation of the rig motors at the oilfield. |
Apparatus used to measure and record vibrations in the earth. It is used to detect possible oil-bearing structures.
The geologists at the oil fields used a _______ to detect possible oil bearing structures. |